Table, list and tree
The table and the list show the tasks of the open project (or of all projects) row by row. This article describes what a row holds, how to sort, how the tree of subtasks works and how long lists are loaded. How to filter is in Filters, search and saved searches; the board has its own article, Board.
A row of the table
From left to right a row holds:
- the star (Añadir a favoritos / Quitar de favoritos) that adds the task to your favorites;
- the selection checkbox (Seleccionar tarea) with the right Gestionar tareas; the checkbox in the header (Seleccionar todo) selects every task shown;
- the chevron that unfolds subtasks, then the task number such as KEY-12, the task icon if one is set, and the title;
- in the flat structure a small mark
↳ KEY-Nwith the parent of a subtask; a pointer on it shows Elemento superior and the parent title, and a parent hidden from you shows Elemento superior no disponible — eliminado o no visible para usted; - the plus (Añadir subtarea) that appears under the pointer on a row with the right to manage tasks;
- the chosen columns: Estado as a coloured pill with the colour of the board column, Responsable with an avatar, Prioridad as a pill, Tipo, Etiquetas in the colours of the tag catalog, Vence, Actualizada with the date and time in your time zone, Autor, Creada with the date, Archivos adjuntos with the number of files, and the project fields.
A due date that has passed is shown in the warning colour and is read as Vencidas. A click anywhere on a row opens the task card.
The columns are chosen in Configuración de la vista → Columnas. To move a column, drag its header to another place.
Sorting
Sorting is set in the table headers of one project.
- The headers Tarea (by title), Estado, Tipo, Prioridad, Vence, Creada and Actualizada are buttons. An arrow shows the direction, and a screen reader reads a sorted header as the name of the column with the word ascendente or descendente.
- The first click sorts in ascending order, the second in descending order, the third removes the sorting.
- While a sorting is active, tasks are shown one after another instead of the tree; removing the sorting brings the tree back.
- The sorting is kept in the address of the window and in your view.
List
The view Lista shows each task on two lines: the number and the title, and below them the state pill, the assignee, the priority, the overdue due date and the line actualizada … (the date and time of the last change stand in place of the ellipsis). The state pill is repeated at the right edge. The star, the checkbox, the chevron and the plus work as in the table.
Tree and flat
Árbol shows subtasks under their parents; the chevron unfolds a parent, and Expandir todo and Contraer todo in Configuración de la vista do it for all parents at once. A parent with many subtasks loads them in portions (Cargando más…). Plana shows every task as its own row, one after another.
Folding works on the tree while the conditions and the text field of the capsule are empty.
Grouping
The menu Configuración de la vista → Agrupar por splits the table and the list into sections; see View settings. A section header reads Name — number of tasks and folds the section. When a grouped list is too long, the line No se muestran todas las tareas — restrinja la búsqueda asks you to narrow the search.
Long lists: by scrolling or by pages
Listas largas in Configuración de la vista chooses how a long list is loaded:
- Con desplazamiento (the default) loads the next rows as you scroll down;
- Por páginas shows a footer with the range of rows and the total, the choice Filas por página with 10, 20, 50 or 100 rows (50 by default) and the buttons Página anterior and Página siguiente.
The setting applies to every list in the product.
Recent tasks strip
Under the window toolbar the strip Tareas recientes keeps up to eight tasks of the open project that you opened lately. Each tab shows a dot in the colour of the task state and the title; the title of a closed task is struck through. A click on a tab opens the task, the cross (Cerrar pestaña) closes the tab, and a drag changes the order of tabs. The tabs are remembered in your browser. When the switch Abrir en una ventana nueva is on, every task opens in its own window and the strip is hidden.
When the list is empty
- With conditions: Ninguna tarea coincide con los filtros; with the right to manage tasks the hint Borre los filtros o cree la primera tarea de este proyecto. is added.
- With empty conditions: Aún no hay tareas en este proyecto and, with the right to manage tasks, the hint Cree la primera tarea de este proyecto. with the button Nueva tarea.
- If the loading of the list fails: No se pudo cargar la lista de tareas with a retry button.
The list refreshes by itself when colleagues change tasks of the project and when you return to the window.