The table and the list show the tasks of the open project (or of all projects) row by row. This article describes what a row holds, how to sort, how the tree of subtasks works and how long lists are loaded. How to filter is in Filters, search and saved searches; the board has its own article, Board.

A row of the table​

From left to right a row holds:

  • the star (Ajouter aux favoris / Retirer des favoris) that adds the task to your favorites;
  • the selection checkbox (Sélectionner la tâche) with the right Gérer les tâches; the checkbox in the header (Tout sélectionner) selects every task shown;
  • the chevron that unfolds subtasks, then the task number such as KEY-12, the task icon if one is set, and the title;
  • in the flat structure a small mark ↳ KEY-N with the parent of a subtask; a pointer on it shows Élément parent and the parent title, and a parent hidden from you shows Élément parent indisponible — supprimé ou non visible pour vous;
  • the plus (Ajouter une sous-tâche) that appears under the pointer on a row with the right to manage tasks;
  • the chosen columns: État as a coloured pill with the colour of the board column, Responsable with an avatar, Priorité as a pill, Type, Étiquettes in the colours of the tag catalog, Échéance, Mise à jour with the date and time in your time zone, Auteur, Créée with the date, Pièces jointes with the number of files, and the project fields.

A due date that has passed is shown in the warning colour and is read as En retard. A click anywhere on a row opens the task card.

The columns are chosen in Paramètres de la vue → Colonnes. To move a column, drag its header to another place.

Sorting​

Sorting is set in the table headers of one project.

  • The headers Tâche (by title), État, Type, Priorité, Échéance, Créée and Mise à jour are buttons. An arrow shows the direction, and a screen reader reads a sorted header as the name of the column with the word croissant or décroissant.
  • The first click sorts in ascending order, the second in descending order, the third removes the sorting.
  • While a sorting is active, tasks are shown one after another instead of the tree; removing the sorting brings the tree back.
  • The sorting is kept in the address of the window and in your view.

List​

The view Liste shows each task on two lines: the number and the title, and below them the state pill, the assignee, the priority, the overdue due date and the line mise à jour … (the date and time of the last change stand in place of the ellipsis). The state pill is repeated at the right edge. The star, the checkbox, the chevron and the plus work as in the table.

Tree and flat​

Arbre shows subtasks under their parents; the chevron unfolds a parent, and Tout développer and Tout réduire in Paramètres de la vue do it for all parents at once. A parent with many subtasks loads them in portions (Chargement de plus d'éléments…). À plat shows every task as its own row, one after another.

Folding works on the tree while the conditions and the text field of the capsule are empty.

Grouping​

The menu Paramètres de la vue → Regrouper par splits the table and the list into sections; see View settings. A section header reads Name — number of tasks and folds the section. When a grouped list is too long, the line Toutes les tâches ne sont pas affichées — affinez la recherche asks you to narrow the search.

Long lists: by scrolling or by pages​

Longues listes in Paramètres de la vue chooses how a long list is loaded:

  • Par défilement (the default) loads the next rows as you scroll down;
  • Par pages shows a footer with the range of rows and the total, the choice Lignes par page with 10, 20, 50 or 100 rows (50 by default) and the buttons Page précédente and Page suivante.

The setting applies to every list in the product.

Recent tasks strip​

Under the window toolbar the strip Tâches récentes keeps up to eight tasks of the open project that you opened lately. Each tab shows a dot in the colour of the task state and the title; the title of a closed task is struck through. A click on a tab opens the task, the cross (Fermer l'onglet) closes the tab, and a drag changes the order of tabs. The tabs are remembered in your browser. When the switch Ouvrir dans une nouvelle fenêtre is on, every task opens in its own window and the strip is hidden.

When the list is empty​

  • With conditions: Aucune tâche ne correspond aux filtres; with the right to manage tasks the hint Effacez les filtres ou créez la première tâche de ce projet. is added.
  • With empty conditions: Aucune tâche dans ce projet pour l'instant and, with the right to manage tasks, the hint Créez la première tâche de ce projet. with the button Nouvelle tâche.
  • If the loading of the list fails: Impossible de charger la liste des tâches with a retry button.

The list refreshes by itself when colleagues change tasks of the project and when you return to the window.