Table, list and tree
The table and the list show the tasks of the open project (or of all projects) row by row. This article describes what a row holds, how to sort, how the tree of subtasks works and how long lists are loaded. How to filter is in Filters, search and saved searches; the board has its own article, Board.
A row of the table
From left to right a row holds:
- the star (Dodaj do ulubionych / Usuń z ulubionych) that adds the task to your favorites;
- the selection checkbox (Zaznacz zadanie) with the right Zarządzanie zadaniami; the checkbox in the header (Zaznacz wszystko) selects every task shown;
- the chevron that unfolds subtasks, then the task number such as KEY-12, the task icon if one is set, and the title;
- in the flat structure a small mark
↳ KEY-Nwith the parent of a subtask; a pointer on it shows Element nadrzędny and the parent title, and a parent hidden from you shows Element nadrzędny niedostępny — usunięty lub niewidoczny; - the plus (Dodaj podzadanie) that appears under the pointer on a row with the right to manage tasks;
- the chosen columns: Stan as a coloured pill with the colour of the board column, Wykonawca with an avatar, Priorytet as a pill, Typ, Tagi in the colours of the tag catalog, Termin, Zaktualizowano with the date and time in your time zone, Autor, Utworzono with the date, Załączniki with the number of files, and the project fields.
A due date that has passed is shown in the warning colour and is read as Po terminie. A click anywhere on a row opens the task card.
The columns are chosen in Ustawienia widoku → Kolumny. To move a column, drag its header to another place.
Sorting
Sorting is set in the table headers of one project.
- The headers Zadanie (by title), Stan, Typ, Priorytet, Termin, Utworzono and Zaktualizowano are buttons. An arrow shows the direction, and a screen reader reads a sorted header as the name of the column with the word rosnąco or malejąco.
- The first click sorts in ascending order, the second in descending order, the third removes the sorting.
- While a sorting is active, tasks are shown one after another instead of the tree; removing the sorting brings the tree back.
- The sorting is kept in the address of the window and in your view.
List
The view Lista shows each task on two lines: the number and the title, and below them the state pill, the assignee, the priority, the overdue due date and the line zaktualizowano … (the date and time of the last change stand in place of the ellipsis). The state pill is repeated at the right edge. The star, the checkbox, the chevron and the plus work as in the table.
Tree and flat
Drzewo shows subtasks under their parents; the chevron unfolds a parent, and Rozwiń wszystko and Zwiń wszystko in Ustawienia widoku do it for all parents at once. A parent with many subtasks loads them in portions (Wczytywanie kolejnych…). Płaska shows every task as its own row, one after another.
Folding works on the tree while the conditions and the text field of the capsule are empty.
Grouping
The menu Ustawienia widoku → Grupuj według splits the table and the list into sections; see View settings. A section header reads Name — number of tasks and folds the section. When a grouped list is too long, the line Nie wszystkie zadania są pokazane — zawęź wyszukiwanie asks you to narrow the search.
Long lists: by scrolling or by pages
Długie listy in Ustawienia widoku chooses how a long list is loaded:
- Przewijaniem (the default) loads the next rows as you scroll down;
- Stronami shows a footer with the range of rows and the total, the choice Wierszy na stronę with 10, 20, 50 or 100 rows (50 by default) and the buttons Poprzednia strona and Następna strona.
The setting applies to every list in the product.
Recent tasks strip
Under the window toolbar the strip Ostatnie zadania keeps up to eight tasks of the open project that you opened lately. Each tab shows a dot in the colour of the task state and the title; the title of a closed task is struck through. A click on a tab opens the task, the cross (Zamknij kartę) closes the tab, and a drag changes the order of tabs. The tabs are remembered in your browser. When the switch Otwieraj w nowym oknie is on, every task opens in its own window and the strip is hidden.
When the list is empty
- With conditions: Żadne zadanie nie pasuje do filtrów; with the right to manage tasks the hint Wyczyść filtry lub utwórz pierwsze zadanie w tym projekcie. is added.
- With empty conditions: Brak zadań w tym projekcie and, with the right to manage tasks, the hint Utwórz pierwsze zadanie w tym projekcie. with the button Nowe zadanie.
- If the loading of the list fails: Nie udało się wczytać listy zadań with a retry button.
The list refreshes by itself when colleagues change tasks of the project and when you return to the window.