Task properties
The shelf at the right of the task card lists the properties of the task. With the right Zarządzanie zadaniami every property is changed right there; each change is saved at once and shows in the list, on the board and in the history of the task. Otherwise the shelf shows the values only.
Rows of the shelf
| Row | How it works |
|---|---|
| Projekt | The project with its tile. It shows where the task lives; to move the task, see Moving a task to another project. |
| Stan | A choice among the states of the project (the board columns). Qubix saves the change when the column of the new state has room and every transition check lets the change through. |
| Priorytet | A choice among the levels of the priority scale of the project. The field can be cleared; an empty value reads Bez priorytetu. |
| Typ | A choice among the types of the project; the field can be cleared. |
| Wykonawca | The people of the project with their avatars and handles; start typing to search. The first line, Nieprzypisany, removes the assignee. Only people who may see the task are offered, because an assignee has to see the task. |
| Termin | A date. A click opens the input; Enter or leaving the field saves it, Esc cancels. A date that has passed on an open task is shown in the warning colour and is read as Po terminie. The year has to be between 1970 and 2105; a year outside them is refused with Rok terminu musi mieścić się w przedziale od … do … (the two limits stand in place of the ellipses). |
| Tagi | The tags of the task, separated by commas; a task without tags reads Brak tagów, and the same words stand in the check list when the project has no tags. A click opens a check list of the project tags; tick or untick tags. The field Nowy tag… at the bottom creates a tag: type the name and press Enter. With the right Zarządzanie projektami zadań, on a project you may edit, a colour picker next to the field gives the new tag its colour in the catalog. |
| Icon | The icon of the task, shown before its title in the card, the table and on the board. The row shows the name of the icon, or No icon when there is none. A click opens a panel with the search Search icons and a grid of icons (flag, star, bookmark, bug, rocket and others); No icons found answers a search with an empty result. The panel also holds the colour of the icon (Color, Bez koloru) and the button Remove icon |
| Custom fields of the project | One row per field, labelled with its name. A required field carries an asterisk; a pointer on its name shows the hint Required |
Change a value
Custom fields
The type of the field, set in Types, priorities, fields and tags, decides how the row works:
- Tekst — a text input; the value is saved when you press
Enteror leave the field,Esccancels. - Liczba — an input for a number with a check of the typed value.
- Data — a date; with the option Include time a date with time in your time zone. The year has to be between 1970 and 2105; a year outside them is refused with The year must be from … to … (the two limits stand in place of the ellipses).
- Lista — a choice among the options of the field; with Multiple values several options at once.
- Użytkownik — a choice among people; with Multiple values several people.
A required field always keeps a value: Qubix refuses the change that would clear it and says which field it is. A new task takes the value set in Value for a new task for the field, if there is one.
The icons
The grid of the icon panel holds these icons; a pointer on an icon shows its name, and the search finds an icon by its name as well: Flag, Star, Bookmark, Heart, Lightning, Flame, Target, Rocket, Bug, Light bulb, Sparkles, Trophy, Crown, Gem, Gift, Bell, Warning, Question, Check mark, Lock, Shield, Key, Clock, Calendar, Code, Terminal, Database, Server, Globe, Smartphone, Mail, Message, People, Megaphone, Chart, Money, Briefcase, Document, Palette, Wrench.
Changes by colleagues
When a colleague changes the task, the shelf refreshes by itself. Your own change is written to the history of the task, see Comments and history.