Pular para o conteúdo principal

Table, list and tree

The table and the list show the tasks of the open project (or of all projects) row by row. This article describes what a row holds, how to sort, how the tree of subtasks works and how long lists are loaded. How to filter is in Filters, search and saved searches; the board has its own article, Board.

A row of the table​

From left to right a row holds:

  • the star (Adicionar aos favoritos / Remover dos favoritos) that adds the task to your favorites;
  • the selection checkbox (Selecionar tarefa) with the right Gerenciar tarefas; the checkbox in the header (Selecionar tudo) selects every task shown;
  • the chevron that unfolds subtasks, then the task number such as KEY-12, the task icon if one is set, and the title;
  • in the flat structure a small mark ↳ KEY-N with the parent of a subtask; a pointer on it shows Item pai and the parent title, and a parent hidden from you shows Item pai indisponível — excluído ou não visível para você;
  • the plus (Adicionar subtarefa) that appears under the pointer on a row with the right to manage tasks;
  • the chosen columns: Estado as a coloured pill with the colour of the board column, Responsável with an avatar, Prioridade as a pill, Tipo, Etiquetas in the colours of the tag catalog, Prazo, Atualizada with the date and time in your time zone, Autor, Criada with the date, Anexos with the number of files, and the project fields.

A due date that has passed is shown in the warning colour and is read as Em atraso. A click anywhere on a row opens the task card.

The columns are chosen in Configurações da visualização → Colunas. To move a column, drag its header to another place.

Sorting​

Sorting is set in the table headers of one project.

  • The headers Tarefa (by title), Estado, Tipo, Prioridade, Prazo, Criada and Atualizada are buttons. An arrow shows the direction, and a screen reader reads a sorted header as the name of the column with the word crescente or decrescente.
  • The first click sorts in ascending order, the second in descending order, the third removes the sorting.
  • While a sorting is active, tasks are shown one after another instead of the tree; removing the sorting brings the tree back.
  • The sorting is kept in the address of the window and in your view.

List​

The view Lista shows each task on two lines: the number and the title, and below them the state pill, the assignee, the priority, the overdue due date and the line atualizada … (the date and time of the last change stand in place of the ellipsis). The state pill is repeated at the right edge. The star, the checkbox, the chevron and the plus work as in the table.

Tree and flat​

Árvore shows subtasks under their parents; the chevron unfolds a parent, and Expandir tudo and Recolher tudo in Configurações da visualização do it for all parents at once. A parent with many subtasks loads them in portions (Carregando mais…). Plana shows every task as its own row, one after another.

Folding works on the tree while the conditions and the text field of the capsule are empty.

Grouping​

The menu Configurações da visualização → Agrupar por splits the table and the list into sections; see View settings. A section header reads Name — number of tasks and folds the section. When a grouped list is too long, the line Nem todas as tarefas são exibidas — refine a busca asks you to narrow the search.

Long lists: by scrolling or by pages​

Listas longas in Configurações da visualização chooses how a long list is loaded:

  • Por rolagem (the default) loads the next rows as you scroll down;
  • Por páginas shows a footer with the range of rows and the total, the choice Linhas por página with 10, 20, 50 or 100 rows (50 by default) and the buttons Página anterior and Próxima página.

The setting applies to every list in the product.

Recent tasks strip​

Under the window toolbar the strip Tarefas recentes keeps up to eight tasks of the open project that you opened lately. Each tab shows a dot in the colour of the task state and the title; the title of a closed task is struck through. A click on a tab opens the task, the cross (Fechar aba) closes the tab, and a drag changes the order of tabs. The tabs are remembered in your browser. When the switch Abrir em uma nova janela is on, every task opens in its own window and the strip is hidden.

When the list is empty​

  • With conditions: Nenhuma tarefa corresponde aos filtros; with the right to manage tasks the hint Limpe os filtros ou crie a primeira tarefa deste projeto. is added.
  • With empty conditions: Ainda não há tarefas neste projeto and, with the right to manage tasks, the hint Crie a primeira tarefa deste projeto. with the button Nova tarefa.
  • If the loading of the list fails: Não foi possível carregar a lista de tarefas with a retry button.

The list refreshes by itself when colleagues change tasks of the project and when you return to the window.

What's next​