Skip to main content

Project settings

The window Project settings holds the settings of one project. Open it from the window QubDesk: View settings → Project settings (the item needs the right Manage tasks and an open project). The arrow at the top, with the hint Back to project tasks, returns to the tasks of the project.

Who can change what​

Everyone who opens the window sees the settings. The fields change, and the buttons Save and Delete project appear, for people with the right Manage task projects; for the others the fields are read-only. Qubix accepts the changes from the owner of the project and from administrators.

An administrator sees two tabs, Project and Defaults; the second is described in Defaults for new projects. For other people the window has the first tab only. Before a project is open the window says Pick a project to configure.

What the tab Project holds​

BlockWhat it setsArticle
Project nameThe name of the project. Required.This article
DescriptionA free description of the project.This article
VisibilityWho sees the project and its tasks: Private, Team-wide (offered when you belong to a team) or Public. The hint reads Who can see this project and its tasks. What each level opens is set by the permission template, group QubDesk, see Templates.This article
Project iconThe icon or the picture shown in the project tile instead of the key.This article
Board columns (statuses)States of tasks, their colours, meanings and card limits.Board columns (states)
Task typesTask types.Types, priorities, fields and tags
Priority scaleLevels of priority.Types, priorities, fields and tags
Custom fieldsCustom fields.Types, priorities, fields and tags
TagsThe catalog of tags with colours.Types, priorities, fields and tags
Task rulesThe rules that work on the tasks of the project; a list only.Task rules

The project icon​

The tile of the project in the left plate shows the key, or an icon, or a picture. Under Project icon the tile is shown at the left, then:

  • the choice of an icon, the same as for a task (Search icons, the grid of icons, Remove icon);
  • the button Upload image that takes a picture (PNG, JPEG, GIF or WebP) and the button Remove image once a picture is set. A picture replaces the icon from the set. A picture that is too large or of another format is refused with a message under the card.

The hint says: Shown in the project's square instead of the key. A custom image replaces the icon from the set. With the right Manage task projects, when the buttons of the picture are shown, a second sentence follows it: Image: PNG, JPEG, GIF or WebP.

Save the settings​

The blocks of the tab are saved together by Save. While the name of the project or of any column, type, level or field is empty, the button is dimmed and a line explains: Enter a project name or Name every column, type and field before saving. Tags are merged with the changes colleagues made meanwhile, so a tag that a colleague added is kept. The icon picture is uploaded at once, when you choose it.

If narrowing the visibility of the project took the access away from some assignees, the note Removed assignees who can no longer see the task (…) (the number stands in place of the ellipsis) lists them after saving, one line … “…” — … per person.

Delete a project​

The button Delete project at the bottom (with the right Manage task projects) removes an empty project. It asks Delete project "…"? This can't be undone. (the name of the project stands in place of the ellipsis), which warns that the deletion is final, and then opens the list of all tasks. A project that still holds tasks, drafts included, answers with the number of tasks: delete or move them first (see Deleting and restoring tasks). A project whose tasks are hidden from you answers that it has tasks hidden from you.

What's next​