View settings
The round button View settings in the title bar of QubDesk opens the menu of the window. It collects everything that changes how tasks are shown and the actions on the whole list. The menu adapts to the open view, so some items appear only where they make sense.
Items of the menu
| Item | What it does | Where it is shown |
|---|---|---|
| Display | A switch between Table, List and Board, with the hint How tasks are shown in the content area. The same switch is the capsule of three buttons in the title bar. | Always. In the list of all tasks only the table is available. |
| Structure | Flat or Tree, with the hint Flat — one after another; tree — subtasks under their parent. | Table and list of one project. |
| Group by | A list: No grouping, State, Assignee, Priority, Type, Parent and the project fields of the type List or User with a single value. The hint Splits the list into sections by field value. is shown for the table and the list. | Always. On the board State is dimmed; in the list of all tasks only Assignee is available. |
| Columns | A check list of the table columns. | Table. |
| Open in a new window | A switch with the hint The task opens in a separate window. When it is on, a task opens in its own window and the strip of recent tasks is hidden. | One project. |
| Long lists | By pages or By scrolling, with the hint This setting applies to every list in the product. | Table and list, including the list of all tasks. |
| Expand all and Collapse all | Open or close all parents of the tree at once. | When the list is shown as a tree and the conditions and the text field of the capsule are empty. |
| Keyboard | Opens the list of keys, see Keyboard shortcuts. | Always. |
| Project settings | Opens the project settings window, see Project settings. | One project, with the right Manage tasks. |
| Follow project / Unfollow project | Subscribes you to the new tasks of the project, or cancels it. | One project. |
| Export CSV | Downloads the list as a CSV file, see Exporting tasks. | One project and all tasks. |
| Export to Excel (XLSX) | Downloads the list as an Excel file. | One project and all tasks. |
| Import tasks… | Opens the import wizard, see Importing tasks. | One project, with the right Manage tasks and when you may edit the project. |
Which items appear in which view
What is remembered
Your choices of sorting, search, conditions, grouping, columns and structure are saved in your profile, one set for all projects. A window opened by its plain address starts with them. The mode table, list or board is kept only in the address of the window: the plain address opens the table. A link with its own view overrides the saved choices for that window; what is saved stays as it was, and saving starts when you change something yourself.
The switches Open in a new window and Long lists are saved in the profile too. Long lists applies to every list in the product, tasks included; the default is By scrolling.
Group by
Grouping splits the table and the list into sections. Each section is a header Name — number of tasks that folds and unfolds; sections with many tasks load more rows on demand. The sections follow the order of the project settings: states in the order of the columns, priorities in the order of the scale, list fields in the order of their options. Tasks with an empty value gather in a section named after it, for example Unassigned or No priority.
On the board, grouping by another field than the state splits the board into lanes, see Board.
Choosing Tree clears the sorting and the grouping, because the tree shows tasks under their parents.
Columns
The check list has the columns State, Assignee, Priority, Type, Tags, Due, Updated, Author, Created, Attachments and one column for every custom field of the project. The column Task is always shown. By default the table shows State, Assignee, Priority and Updated. You can also drag a column header to another place to change the order, see Table, list and tree.