Table, list and tree
The table and the list show the tasks of the open project (or of all projects) row by row. This article describes what a row holds, how to sort, how the tree of subtasks works and how long lists are loaded. How to filter is in Filters, search and saved searches; the board has its own article, Board.
A row of the table
From left to right a row holds:
- the star (加入收藏 / 取消收藏) that adds the task to your favorites;
- the selection checkbox (选择任务) with the right 管理任务; the checkbox in the header (全选) selects every task shown;
- the chevron that unfolds subtasks, then the task number such as KEY-12, the task icon if one is set, and the title;
- in the flat structure a small mark
↳ KEY-Nwith the parent of a subtask; a pointer on it shows 父任务 and the parent title, and a parent hidden from you shows 父任务不可用 — 已被删除或对您不可见; - the plus (添加子任务) that appears under the pointer on a row with the right to manage tasks;
- the chosen columns: 状态 as a coloured pill with the colour of the board column, 负责人 with an avatar, 优先级 as a pill, 类型, 标签 in the colours of the tag catalog, 截止日期, 更新时间 with the date and time in your time zone, 作者, 创建时间 with the date, 附件 with the number of files, and the project fields.
A due date that has passed is shown in the warning colour and is read as 已逾期. A click anywhere on a row opens the task card.
The columns are chosen in 视图设置 → 列. To move a column, drag its header to another place.
Sorting
Sorting is set in the table headers of one project.
- The headers 任务 (by title), 状态, 类型, 优先级, 截止日期, 创建时间 and 更新时间 are buttons. An arrow shows the direction, and a screen reader reads a sorted header as the name of the column with the word 升序 or 降序.
- The first click sorts in ascending order, the second in descending order, the third removes the sorting.
- While a sorting is active, tasks are shown one after another instead of the tree; removing the sorting brings the tree back.
- The sorting is kept in the address of the window and in your view.
List
The view 列表 shows each task on two lines: the number and the title, and below them the state pill, the assignee, the priority, the overdue due date and the line 更新于 … (the date and time of the last change stand in place of the ellipsis). The state pill is repeated at the right edge. The star, the checkbox, the chevron and the plus work as in the table.
Tree and flat
树状 shows subtasks under their parents; the chevron unfolds a parent, and 全部展开 and 全部折叠 in 视图设置 do it for all parents at once. A parent with many subtasks loads them in portions (正在加载更多…). 平铺 shows every task as its own row, one after another.
Folding works on the tree while the conditions and the text field of the capsule are empty.
Grouping
The menu 视图设置 → 分组依据 splits the table and the list into sections; see View settings. A section header reads Name — number of tasks and folds the section. When a grouped list is too long, the line 未显示全部任务 — 请缩小搜索范围 asks you to narrow the search.
Long lists: by scrolling or by pages
长列表 in 视图设置 chooses how a long list is loaded:
- 滚动加载 (the default) loads the next rows as you scroll down;
- 分页 shows a footer with the range of rows and the total, the choice 每页行数 with 10, 20, 50 or 100 rows (50 by default) and the buttons 上一页 and 下一页.
The setting applies to every list in the product.
Recent tasks strip
Under the window toolbar the strip 最近的任务 keeps up to eight tasks of the open project that you opened lately. Each tab shows a dot in the colour of the task state and the title; the title of a closed task is struck through. A click on a tab opens the task, the cross (关闭标签页) closes the tab, and a drag changes the order of tabs. The tabs are remembered in your browser. When the switch 在新窗口中打开 is on, every task opens in its own window and the strip is hidden.
When the list is empty
- With conditions: 没有符合筛选条件的任务; with the right to manage tasks the hint 请清除筛选条件,或创建此项目的第一个任务。 is added.
- With empty conditions: 此项目中暂无任务 and, with the right to manage tasks, the hint 创建此项目的第一个任务。 with the button 新建任务.
- If the loading of the list fails: 无法加载任务列表 with a retry button.
The list refreshes by itself when colleagues change tasks of the project and when you return to the window.